Skip to content
DoItJag

Production Cost Calculator

Add the materials in one unit, the labour and machine minutes, and any overheads or set-up costs for the batch. The calculator shows the production cost per unit and per batch, the share of each cost and, if you add a price, the profit per unit.

How many units this production run makes. Batch costs are spread over them.

Bill of materials for one unit
  • Quantity per unit: how much ends up in one finished unit (kg, pieces, metres…).
  • Cost per quantity: price of one kg, piece or metre of the material.
  • Scrap %: share of the issued material lost in cutting, trimming or spills. Empty = 0.

Person-minutes of direct work in one unit.

Cost of running the machine for one hour. Not sure? Work it out below.

Work out the machine hour rate

Depreciation, maintenance contract, insurance, floor space for one year.

Hours the machine actually runs, not hours the factory is open.

Coolant, tooling wear, consumables.

Optional. Supervision, factory rent and similar costs absorbed on labour.

Optional amount per unit.

Optional. Machine set-up, tooling, first-off inspection.

Formulas used

  • material issued = quantity per unit ÷ (1 − scrap % ÷ 100)
  • prime cost = materials + direct labour
  • machine hour rate = yearly fixed machine costs ÷ productive hours + kW × price per kWh + other running cost per hour
  • unit cost = materials + labour + machine minutes ÷ 60 × machine hour rate + overhead + batch costs ÷ batch quantity

No rates are built in: type your own costs, wages and percentages. Results are rounded for display only; the calculation keeps full precision.

Building a unit cost from the shop floor up

This calculator follows the order of a cost sheet: direct materials, then direct labour (together the prime cost), then machine time and factory overhead, and finally costs that belong to the whole batch rather than to each piece.

Materials and the bill of materials

List every material that goes into one finished unit, with the quantity that ends up in the product and the price you pay per kg, metre or piece. Offcuts, trimmings and spills are handled through the scrap percentage. A bracket that contains 1.9 kg of steel, cut from stock with 5% loss, needs 2 kg issued, and you pay for all 2 kg.

Labour and machine time

Enter labour as person-minutes per unit and an hourly labour cost. Machine time works the same way, priced at a machine hour rate. If you do not have a rate, open the helper: divide the yearly fixed costs of the machine (depreciation, maintenance contract, insurance, the floor it stands on) by the hours it really runs in a year, then add electricity and consumables per running hour.

Overheads and batch costs

Factory overhead can be added as a percentage of labour cost, as a fixed amount per unit, or both. Set-up, tooling and first-article inspection are paid once per batch, so they are divided by the batch quantity. That is why small batches cost more per piece.

Worked example

A batch of 100 units uses the bracket above plus 0.1 litres of paint at 200 a litre, 30 labour minutes at 120 an hour and 15 machine minutes at 200 an hour. Overhead is 50% of labour plus 5 a unit, and set-up costs 1,000. The unit cost is 120 + 60 + 50 + 35 + 10 = 275.

Limits

The figure is an estimate built from your inputs. It does not allocate administration or selling costs, and it is not the same as cost of goods sold in your accounts.

How to use Production Cost Calculator

  1. Enter the batch quantity and list the materials in one unit with their quantity, cost and scrap %.
  2. Add labour and machine minutes per unit with their hourly rates. Open the helper to work out a machine hour rate.
  3. Add overheads and batch costs if you have them, then read the cost per unit and download the breakdown as CSV.

Privacy: how it works

Calculations run in your browser. The amounts you enter are not sent anywhere.

Frequently asked questions

How is the machine hour rate worked out?

Yearly fixed machine costs (depreciation, maintenance, insurance, space) are divided by the hours the machine actually runs in a year, then power (kW × price per kWh) and other running costs per hour are added. With 240,000 of fixed costs, 4,000 hours, 15 kW at 8 per kWh and 20 of other costs, the rate is 60 + 120 + 20 = 200 an hour.

How is scrap included in the material cost?

The quantity you enter is what ends up in the finished unit. The calculator divides it by (1 − scrap %) to get the quantity issued, so 1.9 kg with 5% scrap means 2 kg is bought and paid for.

Is this the same as cost of goods sold?

No. This is the cost to make one unit. Cost of goods sold is an accounting figure for a period (opening stock + purchases − closing stock) and includes only the units actually sold.