Skip to content
DoItJag

Scrap Percentage Calculator

Enter the total input and how much was scrapped. Add costs to see the money lost, and list scrap by reason to see which few causes account for most of it.

Everything started or issued in the period.

Thrown away or sold as scrap, in the same unit.

Repaired and passed, not scrapped.

Material plus the work already done on it.

Scrap by reason (optional)

List the causes to see which ones make up most of the scrap (largest first).

Formulas used

  • scrap % = scrap ÷ total input × 100
  • scrap compared with good output = scrap ÷ (input − scrap) × 100
  • net scrap loss = scrap × cost per unit − scrap × sale value + rework × rework cost

Some factories quote scrap against good output instead of input; both are shown, so say which one you report. Results are rounded for display only; the calculation keeps full precision.

Turning scrap counts into money and priorities

Every rejected part has already used material, machine time and labour. A scrap rate tells you how often that happens; a scrap cost tells you what it is worth fixing; a breakdown by cause tells you where to start. This page gives all three from a handful of numbers.

Two ways people quote scrap

The usual definition divides scrap by total input: 50 bad parts out of 2,000 started is 2.5%. Some factories, and some customer scorecards, divide by good output instead, which gives 2.56% for the same numbers. The difference is small at low scrap rates and large at high ones, so the page shows both. Write down which one you report and stick to it.

Rework is not scrap

Parts that are repaired and shipped are counted as rework, not scrap. They still cost money, so the page adds a rework cost per unit on top of the scrap loss.

Net scrap loss

Multiply the scrap quantity by the cost already sunk into each piece, subtract what you recover by selling the scrap or recycling it, then add the rework cost. In the example above, 50 parts at 40 each cost 2,000; selling the metal brings back 200; repairing 30 parts at 10 each costs 300; the net loss is 2,100 for the period.

Sorting causes

List the reasons recorded at inspection, such as cracks, burrs or wrong dimensions, with the quantity for each. The table puts the largest cause first and shows a running total. This is the idea behind a Pareto chart: a short list of causes often accounts for most of the loss, and that short list is where improvement effort pays back first.

Keeping the inputs honest

If the reason quantities do not add up to the scrap figure, the page says so and works out shares from the reasons total. Gaps like that usually mean scrap was thrown away without being logged. For a combined view with rework, see the manufacturing yield calculator.

How to use Scrap Percentage Calculator

  1. Enter the total input and the scrap quantity in the same unit.
  2. Optionally add rework, the cost per unit, the scrap sale value and the rework cost.
  3. List scrap by reason to get a table sorted from the largest cause, with cumulative shares, and download it.

Privacy: how it works

Calculations run in your browser. The figures you enter are not sent anywhere.

Frequently asked questions

How do I calculate scrap percentage?

Scrap % = scrap ÷ total input × 100. If 50 of 2,000 parts are scrapped, the scrap rate is 2.5%.

Why are there two scrap percentages?

Some plants divide scrap by good output instead of input. 50 scrapped out of 1,950 good parts is 2.56%. Both are shown so you can match the way your company reports it.

What does the reasons table show?

Causes sorted from the largest, with each share and the running total. It is a quick Pareto view: the first two or three rows often cover most of the scrap and are the place to start.