Workload Calculator
List the work for a day, week or month (how many items and how long each takes), then the team’s size, hours, time off and productive share. The calculator shows whether the team is overloaded and how many full-time people the work really needs.
About Workload Calculator
Is the team overloaded, or does it have room for more? Workload Calculator compares two numbers for the same period: the hours the work needs, and the hours the team can really give it. From those it works out the workload percentage, the full-time equivalents (FTE) needed and how many people you are short or have to spare.
Measuring the work
Break the work into tasks you can count: tickets, calls, invoices, visits. For each, enter how many arrive in the period and the average minutes one takes. Timed samples beat guesses. The page converts everything to hours and adds it up.
Measuring the capacity
Paid hours are not all available hours. Enter the scheduled hours per person, subtract planned time off for the period, and then apply a productive share for meetings, breaks, admin and interruptions. The result is the realistic hours one person can put into this work, and that figure is one FTE.
Worked example
In one week a support team handles 400 calls of 15 minutes and writes 50 reports of an hour each. That is 100 + 50 = 150 hours of work. The team has 4 people on 40-hour weeks, with an 80% productive share, so each person gives 32 hours and the team 128 hours.
The workload is 150 ÷ 128 = 117.19%. The work needs 4.69 FTE, so the team is about 0.69 of a person short, or 22 hours over capacity each week. Options are to add part-time help, reduce handling time or let some work wait.
Reading the result
- Below 100%: there is spare time, shown in hours and people.
- Around 85–95%: busy but workable, depending on how uneven the work is.
- Above 100%: the work cannot all be done in the hours available.
Good to know
- Use one period throughout; mixing weekly counts with monthly hours gives nonsense.
- Peaks are hidden by averages, so check busy days separately.
- After the period, compare plans with actual hours in the Resource Utilization Calculator.
How to use Workload Calculator
- Add each task with the number of items in the period and the minutes one item takes.
- Enter the people in the team, their scheduled hours, time off and productive share.
- Read the workload percentage, the people needed (FTE) and the hours over or under capacity.
Privacy: how it works
Calculations run in your browser. Nothing you type is sent anywhere.
Frequently asked questions
What is the productive share?
The part of paid time left for this work after meetings, breaks, admin and interruptions. It differs between teams; 85% is a common starting guess, and your own time records give a better figure.
What does FTE mean?
Full-time equivalent: the number of full-time people the work needs. 4.69 FTE means four full-time people plus about two-thirds of another person’s productive time.
Can I use a different period?
Yes. Use any period, as long as the task counts, hours and time off all describe the same one.