Project Cost Calculator

Build a bottom-up cost estimate for a project: add each role with its hours and hourly rate, add materials, licences or travel, then put overhead and a contingency reserve on top. The total, the share of each cost and a chart update as you type.

Labour

Labour line 1

Other costs

Other cost 1

Office, management and admin costs shared across projects, as a % of direct cost. Leave empty for none.

A buffer for known risks. 5-15% is common; riskier work needs more.

Building a project estimate from the bottom up

A bottom-up estimate starts with the work itself rather than a gut-feel total. You list who will do what, for how many hours and at what rate, then add the things you have to buy. Each figure can be challenged and improved on its own, which makes the final number much easier to defend in front of a client or a manager.

Labour first

For most service projects, people are the largest cost. Enter one line per role. “People” is how many with that role, “hours each” is the time one of them spends on the project, and the rate is the cost per hour. Use the loaded cost of an employee, including employer contributions and benefits, not just the salary, or the estimate will come in low.

Other direct costs

Add anything bought specifically for the project: materials, software licences, equipment hire, travel, printing, subcontractors. A negative amount works too, for example a grant or a discount you have already agreed.

Overhead and contingency

Overhead spreads shared running costs, such as rent, finance staff and management time, across projects as a percentage of direct cost. Contingency is different: it is money set aside for identified risks. The calculator applies overhead to the direct cost, then contingency to direct cost plus overhead.

Worked example

A small web project needs a project manager for 120 hours at 60, three developers for 400 hours each at 45 and a designer for 160 hours at 40. Labour comes to 7,200 + 54,000 + 6,400 = 67,600. Licences and hosting add 4,200, so direct cost is 71,800. With 12% overhead (8,616) and 10% contingency on 80,416 (8,041.60), the estimate is 88,457.60.

Limits

The result is only as good as the hours you enter. Compare against similar past projects, and revisit the figure once a schedule exists. Price is a separate decision: profit, tax and payment terms are not added here, so use a margin calculator when you turn cost into a quote.

How to use Project Cost Calculator

  1. Add a labour line for each role: how many people, hours each and the rate per hour.
  2. Add other costs such as materials, software or travel.
  3. Enter overhead and contingency percentages, check the breakdown and download it as a CSV.

Privacy: how it works

Calculations run in your browser. Nothing you type is sent anywhere.

Frequently asked questions

What is the difference between overhead and contingency?

Overhead covers shared running costs, such as office rent or management time, spread across projects. Contingency is a reserve for risks you know about but cannot price exactly yet. The calculator adds overhead to direct costs first, then applies contingency to that subtotal.

How much contingency should I add?

There is no single rule. Many teams use 5 to 15% for familiar work and more for new technology or unclear scope. A risk register helps you size it from the risks you actually expect.

Does it include tax?

No. Taxes depend on your country and contract, so none are built in. Add them as an other-cost line if you need a figure that includes tax.