Project Duration Calculator
List the tasks, how long each could take and which tasks must finish first. The calculator finds the critical path, the expected duration and, with three-point (PERT) estimates, how confident you can be about a deadline. Add a start date to get the finish date on your working calendar.
Durations are in working days. In “Depends on”, list the numbers of the tasks that must finish first.
Task 1
Task 2
Task 3
Shows the chance of finishing within this many working days.
Dates as YYYY-MM-DD, separated by commas or new lines. No public holidays are built in.
How long will the project take?
Adding up every task’s duration usually overstates the answer, because some tasks run side by side. What matters is the longest chain of tasks that have to happen one after another. Project managers call that chain the critical path, and finding it is the heart of this calculator.
Dependencies
In the “Depends on” box, type the numbers of the tasks that must be finished before a task can begin, for example “2, 3”. The calculator then runs a forward pass, giving each task its earliest start and finish, and a backward pass, giving its latest start and finish without delaying the end date. The gap between the two is the float. A task with zero float sits on the critical path.
Three-point estimates
Single numbers hide uncertainty. With PERT, you give an optimistic (O), a most likely (M) and a pessimistic (P) duration for each task. The expected duration is (O + 4M + P) ÷ 6 and the standard deviation is (P − O) ÷ 6. Summing the variances along the critical path and taking the square root gives the spread of the whole project.
Worked example
Load the example on the page. Requirements, design, build and testing form the critical path with expected durations of about 5.3, 8.5, 16 and 5.5 days, giving roughly 35.3 working days. The content-writing task runs alongside design and build, so it has plenty of float. If someone asks for a 38-day commitment, the calculator shows the chance of making it, and the confidence table suggests a figure you can promise with 90% or 95% confidence.
Finish dates
Durations are in working days. Pick your working week, add any holidays and choose a start date; part days round up to a whole day.
Limits
The probability assumes independent tasks and a normal distribution, and it ignores paths that are nearly critical. Real projects also suffer from resource clashes that a network diagram does not show. Use the output to set buffers, not as a guarantee.
How to use Project Duration Calculator
- Choose three estimates per task (PERT) or one estimate per task.
- Enter each task with its durations in working days and the numbers of the tasks it depends on.
- Set the start date, working days and holidays, and read the duration, finish date and critical path.
Privacy: how it works
Calculations run in your browser. Nothing you type is sent anywhere.
Frequently asked questions
What is the critical path?
It is the longest chain of dependent tasks from start to finish. Its length is the shortest possible project duration, and any delay to a task on it delays the whole project. Tasks off the critical path have float: spare days they can slip.
How does PERT work?
For each task you give an optimistic, a most likely and a pessimistic duration. The expected time is (O + 4M + P) ÷ 6 and the uncertainty is (P − O) ÷ 6. Adding the uncertainty along the critical path gives the chance of meeting a deadline.
How accurate is the chance of finishing on time?
It is a model, not a promise. It assumes the tasks are independent and that the total follows a normal distribution, and it ignores near-critical paths. Treat it as a guide for setting buffers.