Gantt Chart Generator
Turn a task list into a Gantt chart without a project-management account. Enter each task’s duration in working days and what it depends on; the generator schedules the dates, skips weekends and holidays, highlights the critical path and draws the chart for you to download.
Durations are in working days (0 makes a milestone). “Depends on” takes task numbers; “Not before” holds a task until a date.
Task 1
Task 2
Task 3
Dates as YYYY-MM-DD, separated by commas or new lines. No public holidays are built in.
Gantt charts in plain terms
A Gantt chart lists tasks down the left and draws each one as a horizontal bar across a calendar. Bar length shows how long the task takes, its position shows when, and arrows show which tasks wait for others. It is still the quickest way to explain a schedule.
From a list to a chart
You type durations and dependencies; the generator works out the dates. Each task starts on the first working day once everything it depends on has finished. A “not before” date holds a task back, which suits work that cannot begin until a delivery or an approval on a known day. A duration of 0 creates a milestone, drawn as a diamond.
Working days
Durations count working days only. A five-day task that starts on a Thursday therefore ends the next Wednesday, and its bar crosses the shaded weekend. Choose a Sunday-to-Thursday or six-day week if that is how your team works, and list public holidays so nothing is scheduled on them.
Critical path and progress
With highlighting on, red bars mark tasks with zero float: delay any of them and the finish date moves. Blue bars have slack. The darker part of each bar shows the done percentage you entered.
Worked example
Load the example and keep a Monday start. The brief takes two days, then wireframes and copywriting run in parallel. Visual design follows the wireframes, development needs both design and copy, and testing comes last before the launch milestone. The red chain shows that copywriting has float but wireframes do not.
Files
The SVG is a vector file that stays sharp when enlarged; paste it into slides or documents. The PNG is a plain picture for email or chat. The CSV gives the computed dates for a spreadsheet.
Limits
The generator supports finish-to-start links without lags. It does not level resources, so two tasks for the same person can overlap. For long programmes, a full scheduling tool will be more practical.
How to use Gantt Chart Generator
- Enter the project start date, then each task with its duration, dependencies and progress.
- Set the working days and any holidays, and choose whether to highlight the critical path.
- Check the preview and download the chart as SVG or PNG, or the schedule as CSV.
Privacy: how it works
Everything happens in your browser. Your tasks are not sent to any server.
Frequently asked questions
How are the dates worked out?
Each task starts on the first working day after all the tasks it depends on have finished, or on its “not before” date if that is later. A task of 5 days covers 5 working days, so weekends inside it make the bar longer.
Can I drag the bars?
No. The chart is drawn from your table, so you change dates by changing durations or dependencies. That keeps the schedule consistent with the critical path.
Which file should I download?
SVG stays sharp at any size and works in Word, PowerPoint and browsers. PNG is a picture for email or chat. The CSV opens in a spreadsheet so you can keep the schedule.