Skip to content
DoItJag

Generator Sizing Calculator

Avoid buying a generator that stalls when the pump or AC starts. List your loads with their running watts, add the starting (surge) watts for motors and compressors, and the calculator finds the peak when the biggest motor starts while everything else runs. It adds your safety margin and converts kW to kVA.

Motors, pumps, compressors (fridge, AC) and power tools draw several times their running power for a moment when they start. Enter that starting (surge) figure from the manual or the generator maker’s chart; leave it empty for lights, fans and electronics.

Load 1

kVA ratings of most generators assume 0.8; check the rating plate.

Editable assumption: spare capacity so the generator does not run flat out.

Formula: kW = (running watts + largest extra starting watts) ÷ 1000 × (1 + margin ÷ 100). kVA = kW ÷ power factor. Start the largest motor first or alone when you can. A generator connected to a building’s wiring needs a changeover switch fitted by a qualified electrician.

Sizing a generator

A generator that is too small trips or stalls the moment a motor starts; one that is far too large burns fuel running lightly loaded and costs more to buy. Good sizing starts with an honest list of what you will run together.

Running and starting watts

Running watts are what a load draws once it is going. Lights, fans, televisions and computers draw roughly the same when they start. Anything with an electric motor is different: pumps, fridges, air conditioners, compressors and many power tools need a burst of several times their running power for a second or two to get moving. The manual, the motor nameplate or the generator maker’s sizing chart gives this starting or surge figure.

Finding the peak

Assume the loads start one at a time and the one with the biggest surge starts last, after everything else is already running. The peak is then the total running watts plus the extra starting watts of that one item. In the example of a 200 W fridge (600 W to start), a 1,500 W air conditioner (4,500 W to start) and four 100 W lights, the running total is 2,100 W and the peak is 2,100 + 3,000 = 5,100 W.

Margin, kW and kVA

A safety margin keeps the engine away from its limit and leaves room for later additions. With 20% added, the example needs about 6.1 kW. Generators are usually rated in kVA; dividing kW by the power factor converts between them. At 0.8 the example works out at about 7.7 kVA.

When everything starts together

After a power cut, all motors may try to start at once when the supply switches over. The page shows that worst case too. A changeover switch or controller that brings loads on one by one avoids it.

Safety

Connecting a generator to a building’s wiring needs a proper changeover switch installed by a qualified electrician, so power cannot flow back into the grid. For the list of loads, the electrical load calculator can help.

How to use Generator Sizing Calculator

  1. Add each load with its running watts, starting watts if it has a motor, and quantity.
  2. Keep or change the power factor and safety margin.
  3. Read the generator size in kVA and kW, and the peak load while starting.

Privacy: how it works

Calculations run in your browser. The figures you enter are not sent anywhere.

Frequently asked questions

Why does starting power matter?

An electric motor draws several times its running power for a moment as it starts. The generator must cover that surge on top of everything already running, or the voltage dips and the motor may not start.

How do kW and kVA differ?

kW is the real power; kVA = kW ÷ power factor. At a power factor of 0.8, a 10 kVA generator gives 8 kW. Check the rating plate for the power factor your generator is rated at.

What if all my loads start together?

The page also shows the peak if every load starts at the same moment. Starting the largest motor first, or on its own, keeps the generator smaller.