Construction Cost Estimator
Build a simple budget for a house or extension. List materials and labour with your own quantities and rates, add a contingency and any percentage fees, and download the estimate as a spreadsheet. Or use area × rate for a quick figure.
Type rates from your own supplier quotes or your local schedule of rates. This page stores no prices, and amounts are in whatever currency you type.
For price rises and surprises; 5 to 10% is common. Typical, change to your engineer's figure.
Architect, engineer or contractor margin, if you pay one as a percentage. 0 if not.
Lines with no quantity and no rate are skipped.
An estimate for budgeting only. It is not a tender, a valuation or a structural design.
A budget you can check line by line
A building estimate is only as good as its quantities and its rates. This page keeps both in your hands: you type each item, its quantity and the rate you have been quoted, and it adds the lines, a contingency and any percentage fees, then lets you download the result as a spreadsheet.
Two methods
Itemised. Start from the starter lines (cement, sand, aggregate, steel, bricks or blocks, labour), rename or delete them, and add your own. Quantities can come from the other calculators here, such as the cement quantity calculator or the rebar weight calculator. Lines left blank are skipped. If you enter the total built-up area, the page also shows the cost per square foot or square metre.
Quick. Multiply the built-up area per floor by the number of floors and a rate per unit area from a local builder. It hides the detail, so treat it as a first look.
Worked example
A ground-floor extension of 400 sq ft is priced item by item: 160 bags of cement at 380, 25 m³ of sand at 1,800, 20 m³ of aggregate at 1,500, 1,800 kg of steel at 65, and labour of 1,20,000 (one line, quantity 1). The subtotal is 3,72,800. A 7% contingency adds 26,096, making 3,98,896 in total, or about 997 per sq ft.
Rates are yours
The page stores no prices and assumes no currency. Good sources are written supplier quotes, your contractor’s breakdown, or a public works department schedule of rates for your area.
The CSV file
The download has columns for item, quantity, unit, rate and amount, followed by subtotal, contingency, fees and total rows. It opens in any spreadsheet, and the preview table shows exactly what it holds.
What it is not
It is a budgeting aid, not a tender, valuation or bill of quantities prepared by a quantity surveyor, and it does not check structural adequacy. Use the material wastage calculator to turn net quantities into order quantities first.
How to use Construction Cost Estimator
- Choose itemised (quantity × rate) or quick (area × rate per area).
- Enter quantities and the rates from your quotes; add or remove lines as needed.
- Check the preview table, then download the estimate as a CSV file.
Privacy: how it works
Calculations run in your browser. Your quantities and rates are not sent anywhere; the CSV is created on your device.
Frequently asked questions
Does the page know local construction rates?
No. Rates change by city, month and specification, so the page stores none. Use supplier quotes, a contractor’s rate per sq ft or your local public works schedule of rates.
How much contingency should I add?
Many people start at 5 to 10% for price rises and surprises; older buildings and unclear drawings need more. It is a typical allowance, not a rule.
Can I open the CSV in Excel or Google Sheets?
Yes. The file has item, quantity, unit, rate and amount columns plus subtotal, contingency, fees and total rows.